Drawing revision numbers
You can now set your drawing revision numbers to start from 0 or 1 in the field attributes. When you upload a drawing with a number that doesn't exist yet in the project, the revision number is set automatically to the default value.
Publishing drawings
When publishing drawings, you can now choose to notify either all project contacts or only drawing set participants. Participants include the author, assignees, courtesy copy recipients, and commenters.
- Imported budget groups are now exported properly. (CN# 01896379)
- When the user’s language preference is set to ‘Espanol’, the user can now use the checkbox to select all the drawings in the list when there are more than 1000 drawings. (CN# 01908219)
- Comments that are entered into a checklist are no longer lost after the record is saved. (CN# 01913076)
- When a project is created, the suffix is now included in the project number. (CN# 01914032)
- The error handling of company imports has been improved to handle multiple errors such as duplicate contact display names. (CN# 01944805)
- When no company records are selected in the tile or list view, all the companies are now exported without an error. (CN# 01944814)
- The budget code structure in the portfolio settings is no longer locked if a deleted project contains a budget record. (CN# 01945708)